Project Details

This page displays current information for project DEA: 031H1904.

Project Information

Project IdentifiersProject ID: 215682
DEA: 031H1904
EFIS: 0316000065
DIST-CO-RTE-PM03-SAC-80,244-M9.6/12.9,0.0/T0.8
Award Date06/18/2021
Closeout DateNot set
Work DescriptionCOLD PLANE AC PAVEMENT, PLACE RHMA AND INDIVIDUAL SLAB REPLACEMENT.
Location DescriptionSACRAMENTO COUNTY IN AND NEAR SACRAMENTO ON ROUTE 80 FROM 0.2 MILE EAST OF LONGVIEW DRIVE OVERCROSSING TO 0.4 MILE EAST OF MADISON AVENUE OVERCROSSING AND ON ROUTE 244 FROM 0.3 MILE NORTH OF AUBURN BOULEVARD TO CONNECTOR TO ROUTE 80
QA Service Level1 (Verified on 05/17/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
deyaedden.elghassein@dot.ca.govDeyaedden ElghasseinResident EngineerCaltrans RE DB
donald.adams@dot.ca.govDonald AdamsMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 74 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2022-10-15-310/15/202210/15/2022Quality ControlHot Mix AsphaltView
2022-10-15-510/15/202210/15/2022Quality ControlHot Mix AsphaltView
2022-10-14-510/14/202210/14/2022Quality ControlHot Mix AsphaltView
2022-10-14-810/14/202210/14/2022Quality ControlAsphaltic EmulsionView
2022-10-13-710/13/202210/13/2022Quality ControlHot Mix AsphaltView
2022-10-13-810/13/202210/13/2022Quality ControlHot Mix AsphaltView
2022-10-12-1410/12/202210/12/2022Quality ControlHot Mix AsphaltView
2022-10-12-1910/12/202210/12/2022Quality ControlHot Mix AsphaltView
2022-10-11-2110/11/202210/11/2022Quality ControlHot Mix AsphaltView
2022-10-11-2210/11/2022Quality ControlHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-1 of 1 result.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2022-18Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory07/05/2022View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods