Project Details

This page displays current information for project DEA: 043G4884.

Project Information

Project IdentifiersProject ID: 215649
DEA: 043G4884
EFIS: 0412000088
DIST-CO-RTE-PM04-SM-92-R14.4/R18.8
Award Date09/01/2022
Closeout DateNot set
Work DescriptionCLEAN AND PAINT STEEL BRIDGE TOWERS, REPLACE HIGH STRENGTH BOLTS.
Location DescriptionSAN MATEO COUNTY IN FOSTER CITY FROM SAN MATEO-HAYWARD BRIDGE TO ALAMEDA COUNTY LINE
QA Service Level1 (Verified on 03/29/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
kingston.atako@dot.ca.govKingston AtakoResident EngineerCaltrans RE DB
stanley.ku@hdrinc.comStanley KuStructural RepresentativeCaltrans SR DB
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 22 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-09-15-109/15/202309/22/2023Department AcceptanceSMTL TM3 - Fastener AssemblyView
2023-09-13-609/13/202309/22/2023Department AcceptanceSMTL TM3 - Fastener AssemblyView
2023-04-18-10804/18/202304/20/2023Per RequestSMTL TM3 - Fastener AssemblyView
2023-04-18-10704/18/202304/20/2023Per RequestSMTL TM3 - Fastener AssemblyView
2023-04-18-10604/18/202304/20/2023Per RequestSMTL TM3 - Fastener AssemblyView
2023-04-18-10504/18/202304/20/2023Per RequestSMTL TM3 - Fastener AssemblyView
2023-04-18-10404/18/202304/20/2023Per RequestSMTL TM3 - Fastener AssemblyView
2023-05-09-705/09/202305/18/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-05-09-605/09/202305/18/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-18-404/18/202304/25/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods