Project Details

This page displays current information for project DEA: 01436404.

Project Information

Project IdentifiersProject ID: 215620
DEA: 01436404
EFIS: 0100000193
DIST-CO-RTE-PM01-DN-101-35.8/36.5
Award Date07/11/2022
Closeout DateNot set
Work DescriptionDr. Fine Bridge Replacement
Location DescriptionDR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER.
QA Service Level1 (Verified on 03/26/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
clayton.malmberg@dot.ca.govClayton MalmbergResident EngineerCaltrans RE DB
brian.cinkutis@dot.ca.govBrian CinkutisStructural RepresentativeCaltrans SR DB
peter.gan@dot.ca.govPeter GanMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 82 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2022-10-31-110/31/202211/02/2022Quality AssuranceSMTL TM5 - Welded HoopsView
2022-10-31-210/31/2022Quality ControlSMTL TM5 - Welded HoopsView
2022-11-22-211/22/202211/28/2022RetestSMTL TM5 - Welded HoopsView
2023-02-15-1302/15/202302/15/2023AcceptanceSMTL TM3 - Fastener AssemblyView
2023-02-28-1202/28/202302/28/2023Quality AssuranceConcreteView
2023-03-02-403/02/202303/03/2023Quality AssuranceSMTL TM5 - CouplersView
2023-04-11-804/11/202304/12/2023VerificationConcreteView
2023-07-18-1107/18/202307/19/2023Quality AssuranceSMTL TM5 - Threaded BarView
2023-08-02-308/02/202308/04/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-08-02-408/02/202308/03/2023Quality ControlSMTL TM5 - Welded HoopsView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-1 of 1 result.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
4790146803.102.1Steel PlateSSAB - AlabamaC&K Johnson Industries (Jesse Johnson)14928 lbs

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods