Project Details

This page displays current information for project DEA: 051K1304.

Project Information

Project IdentifiersProject ID: 215576
DEA: 051K1304
EFIS: 0518000126
DIST-CO-RTE-PM05-SCR-9-20.0
Award Date05/17/2021
Closeout DateNot set
Work DescriptionSoldier pile wall
Location DescriptionMP 20, 1.1 miles South of junction Rte 9 and Rte 236
QA Service Level1 (Verified on 04/07/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Gareth.Gill@dot.ca.govGareth GillResident EngineerCaltrans RE DB
jwilcenski@mnsengineers.comJames WilcenskiStructural RepresentativeCaltrans SR DB
kevin.couch@dot.ca.govKevin CouchMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 11-20 of 23 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2023-02-07-2102/07/202302/07/2023Quality ControlAggregateView
2023-02-07-2202/07/202302/07/2023Quality ControlAggregateView
2023-02-08-2602/08/202302/08/2023Quality ControlAggregateView
2023-02-08-2702/08/202302/08/2023Quality ControlAggregateView
2022-05-10-5405/10/202205/10/2022Quality ControlConcreteView
2022-07-15-4107/15/202207/15/2022Quality ControlConcreteView
2022-10-13-3910/13/202210/13/2022Quality ControlConcreteView
2022-12-22-2712/22/202212/22/2022Quality ControlConcreteView
2022-12-22-2812/22/202212/22/2022Quality ControlConcreteView
2023-02-02-3002/02/202302/02/2023Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods