Project Details
This page displays current information for project DEA: 101J1304.
Project Information
Project Identifiers | Project ID: 215558 DEA: 101J1304 EFIS: 1018000136 |
---|---|
DIST-CO-RTE-PM | 10-CAL,ALP-4,207-R58.0/R65.9,0.0/1.4 |
Award Date | 04/26/2021 |
Closeout Date | 12/07/2021 |
Work Description | COLD PLANE EXISTING PAVEMENT AND RESURFACE WITH HMA. |
Location Description | CALAVERAS AND ALPINE COUNTIES NEAR TAMARACK ON ROUTE 4 FROM 1.8 MILES WEST OF CABBAGE PATCH LOG ROAD TO ALPINE COUNTY LINE AND NEAR LAKE ALPINE ON ROUTE 207 FROM JUNCTION 4/207 TO END OF ROUTE (MT REBA RESORT) |
QA Service Level | 1 (Verified on 03/26/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
pawan.garg@dot.ca.gov | Pawan Garg | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-06-28-28 | 06/28/2021 | 07/02/2021 | Department Acceptance | Asphalt Binder | View |
2021-06-29-18 | 06/29/2021 | 07/02/2021 | Department Acceptance | Asphaltic Emulsion | View |
2021-07-07-21 | 07/07/2021 | 07/26/2021 | Department Acceptance | Asphalt Binder | View |
2021-07-08-39 | 07/08/2021 | 07/21/2021 | Department Acceptance | Asphaltic Emulsion | View |
2021-07-09-16 | 07/09/2021 | 07/26/2021 | Department Acceptance | Asphalt Binder | View |
2021-07-12-42 | 07/12/2021 | 07/26/2021 | Department Acceptance | Asphalt Binder | View |
2021-07-13-27 | 07/13/2021 | 07/26/2021 | Department Acceptance | Asphalt Binder | View |
2021-07-14-21 | 07/14/2021 | 07/26/2021 | Department Acceptance | Asphalt Binder | View |
2021-07-15-29 | 07/15/2021 | 07/26/2021 | Department Acceptance | Asphalt Binder | View |
2021-07-16-53 | 07/16/2021 | 07/26/2021 | Department Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods