Project Details

This page displays current information for project DEA: 051K7004.

Project Information

Project IdentifiersProject ID: 215492
DEA: 051K7004
EFIS: 0518000231
DIST-CO-RTE-PM05-MON-1-64.4
Award Date04/05/2021
Closeout Date08/14/2023
Work DescriptionTREAT EXISTING STRUCTURE WITH ELECTROCHEMICAL CHLORIDE EXTRACTION.
Location DescriptionMONTEREY COUNTY NEAR CARMEL-BY-THE SEA AT GRANITE CANYON BRIDGE
QA Service Level1 (Verified on 03/12/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
arashdeep.pannu@dot.ca.govArashdeep (Art) PannuResident EngineerCaltrans RE DB
anaime@falcon-ca.comAlex NaimeStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-2 of 2 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2022-01-04-901/04/202201/04/2022Quality AssuranceConcreteView
2021-11-30-6211/30/202112/02/2021Quality AssuranceRapid SetView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods