Project Details
This page displays current information for project DEA: 080C8704.
Project Information
Project Identifiers | Project ID: 215462 DEA: 080C8704 EFIS: 0800000064 COOP: 081687 |
---|---|
DIST-CO-RTE-PM | 08-SBD-SR 60-R2.08/2.80 |
Award Date | 11/20/2020 |
Closeout Date | Not set |
Work Description | The project scope of work is widening approximately .7 miles of SR-60 at Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions |
Location Description | Project Limits are SR-60 from 0.3 miles west to 0.4 miles east of Central Ave. PM 2.08/2.80 in Chino. |
QA Service Level | 2 (Verified on 01/18/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kee.Ooi@dot.ca.gov | Kee Ooi | Resident Engineer | Caltrans RE DB |
ccwang@dynamicesi.com | Chia-Chi Wong | Oversight Resident Engineer | Caltrans REO DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-05-21-35 | 05/21/2021 | 05/22/2021 | Quality Control | Concrete | View |
2021-05-25-42 | 05/25/2021 | 05/26/2021 | Quality Control | Concrete | View |
2021-05-28-34 | 05/28/2021 | 05/29/2021 | Quality Control | Concrete | View |
2021-06-07-45 | 06/07/2021 | 06/08/2021 | Quality Control | Concrete | View |
2021-06-10-40 | 06/10/2021 | 06/11/2021 | Quality Control | Concrete | View |
2021-06-14-17 | 06/14/2021 | 06/17/2021 | Quality Assurance | Concrete | View |
2021-06-14-18 | 06/14/2021 | 06/17/2021 | Quality Assurance | Concrete | View |
2021-06-15-67 | 06/15/2021 | 06/16/2021 | Quality Control | Concrete | View |
2021-12-08-26 | 12/08/2021 | 12/09/2021 | Quality Control | Concrete | View |
2021-12-16-7 | 12/16/2021 | 12/17/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods