Project Details

This page displays current information for project DEA: 080C8704.

Project Information

Project IdentifiersProject ID: 215462
DEA: 080C8704
EFIS: 0800000064
COOP: 081687
DIST-CO-RTE-PM08-SBD-SR 60-R2.08/2.80
Award Date11/20/2020
Closeout DateNot set
Work DescriptionThe project scope of work is widening approximately .7 miles of SR-60 at Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions
Location DescriptionProject Limits are SR-60 from 0.3 miles west to 0.4 miles east of Central Ave. PM 2.08/2.80 in Chino.
QA Service Level2 (Verified on 01/18/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
kee.Ooi@dot.ca.govKee OoiResident EngineerCaltrans RE DB
ccwang@dynamicesi.comChia-Chi WongOversight Resident EngineerCaltrans REO DB
jennifer.olarte@dot.ca.govJennifer OlarteMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 10 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2021-05-21-3505/21/202105/22/2021Quality ControlConcreteView
2021-05-25-4205/25/202105/26/2021Quality ControlConcreteView
2021-05-28-3405/28/202105/29/2021Quality ControlConcreteView
2021-06-07-4506/07/202106/08/2021Quality ControlConcreteView
2021-06-10-4006/10/202106/11/2021Quality ControlConcreteView
2021-06-15-6706/15/202106/16/2021Quality ControlConcreteView
2021-06-14-1706/14/202106/17/2021Quality AssuranceConcreteView
2021-06-14-1806/14/202106/17/2021Quality AssuranceConcreteView
2021-12-08-2612/08/202112/09/2021Quality ControlConcreteView
2021-12-16-712/16/202112/17/2021Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods