Project Details
This page displays current information for project DEA: 061A9404.
Project Information
Project Identifiers | Project ID: 215412 DEA: 061A9404 EFIS: 0620000141 |
---|---|
DIST-CO-RTE-PM | 06-FRE-5-20.0/21.0,30.9/37.3 |
Award Date | 02/18/2021 |
Closeout Date | 11/23/2021 |
Work Description | COLD PLANE AND REPLACE WITH RHMA (TYPE O). |
Location Description | FRESNO COUNTY FROM 2 MILES NORTH OF ROUTE 5/33/145 SEPARATION TO SOUTH DERRIC AVENUE OVERCROSSING AND FROM 1 MILE NORTH OF ROUTE 5/33 SEPARATION TO 1.1 MILES SOUTH OF KAMM AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 01/25/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
din.dadawalla@dot.ca.gov | Din Dadawalla | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-06-30-18 | 06/30/2021 | 07/07/2021 | Department Acceptance | Asphaltic Emulsion | View |
2021-06-21-14 | 06/21/2021 | 06/25/2021 | Department Acceptance | Asphalt Rubber Binder | View |
2021-06-21-13 | 06/21/2021 | 06/25/2021 | Department Acceptance | Asphaltic Emulsion | View |
2021-06-20-6 | 06/20/2021 | 06/25/2021 | Department Acceptance | Asphalt Rubber Binder | View |
2021-06-20-5 | 06/20/2021 | 06/25/2021 | Department Acceptance | Asphaltic Emulsion | View |
2021-06-17-11 | 06/17/2021 | 06/21/2021 | Department Acceptance | Asphalt Binder | View |
2021-06-16-9 | 06/16/2021 | 06/21/2021 | Department Acceptance | Asphaltic Emulsion | View |
2021-06-16-8 | 06/16/2021 | 06/21/2021 | Department Acceptance | Asphalt Binder | View |
2021-06-15-41 | 06/15/2021 | 06/21/2021 | Department Acceptance | Asphalt Binder | View |
2021-06-15-27 | 06/15/2021 | 06/21/2021 | Department Acceptance | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods