Project Details
This page displays current information for project DEA: 120S6604.
Project Information
Project Identifiers | Project ID: 215333 DEA: 120S6604 EFIS: 1221000004 |
---|---|
DIST-CO-RTE-PM | 12-ORA-91-R16.6/R17.0 |
Award Date | 05/18/2021 |
Closeout Date | 08/11/2022 |
Work Description | COLD PLANE AC PAVEMENT AND PLACE PRECAST CONCRETE PAVEMENT. |
Location Description | ORANGE COUNTY IN YORBA LINDA FROM W91-S241/91 CONNECTOR SEPARATION TO 0.6 MILE EAST OF GYPSUM CANYON ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 02/22/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
adrian.wu@dot.ca.gov | Adrian Wu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 30 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-08-30-46 | 08/30/2021 | 09/03/2021 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2021-09-17-28 | 09/17/2021 | 09/23/2021 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2021-10-07-118 | 10/07/2021 | 10/08/2021 | Quality Control | Concrete | View |
2021-10-11-42 | 10/11/2021 | 10/12/2021 | Quality Control | Concrete | View |
2021-10-13-62 | 10/13/2021 | 10/14/2021 | Quality Control | Concrete | View |
2021-10-14-75 | 10/14/2021 | 10/15/2021 | Quality Control | Concrete | View |
2021-10-15-47 | 10/15/2021 | 10/18/2021 | Quality Control | Concrete | View |
2021-10-18-54 | 10/18/2021 | 10/19/2021 | Quality Control | Concrete | View |
2021-10-28-47 | 10/28/2021 | 10/29/2021 | Quality Control | Concrete | View |
2021-10-29-32 | 10/29/2021 | 10/30/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods