Project Details
This page displays current information for project DEA: 101J0104.
Project Information
Project Identifiers | Project ID: 215317 DEA: 101J0104 EFIS: 1018000079 |
---|---|
DIST-CO-RTE-PM | 10-CAL,CAL-88,34-34.6/2.2 |
Award Date | 05/19/2022 |
Closeout Date | 11/16/2023 |
Work Description | Construct fuel island canopies. |
Location Description | In Calaveras and Alpine counties on Route 26 at the West Point Maintenance Station and on Route 88 at the Caples Lake Maintenance Station. |
QA Service Level | 1 (Verified on 07/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
pawan.garg@dot.ca.gov | Pawan Garg | Resident Engineer | Caltrans RE DB |
Brandon.Thurber@dot.ca.gov | Brandon Thurber | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 43 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-11-15-18 | 11/15/2022 | 11/17/2022 | Quality Assurance | Concrete | View |
2022-11-09-19 | 11/09/2022 | 11/17/2022 | Quality Assurance | Concrete | View |
2022-11-09-18 | 11/09/2022 | 11/17/2022 | Quality Assurance | Concrete | View |
2022-11-09-14 | 11/09/2022 | 11/14/2022 | Quality Assurance | Concrete | View |
2022-11-09-10 | 11/09/2022 | 11/09/2022 | Quality Control | Concrete | View |
2022-11-09-9 | 11/09/2022 | 11/09/2022 | Quality Control | Aggregate | View |
2022-11-09-8 | 11/09/2022 | 11/09/2022 | Quality Control | Aggregate | View |
2022-10-28-39 | 10/28/2022 | 10/28/2022 | Quality Control | Concrete | View |
2022-10-28-19 | 10/28/2022 | 10/31/2022 | Quality Assurance | Concrete | View |
2022-09-23-7 | 09/23/2022 | 09/26/2022 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods