Project Details
This page displays current information for project DEA: 11056374.
Project Information
Project Identifiers | Project ID: 215257 DEA: 11056374 EFIS: 1117000087 |
---|---|
DIST-CO-RTE-PM | 11-SD-11-0.6/2.7 |
Award Date | 02/16/2021 |
Closeout Date | Not set |
Work Description | CONSTRUCT INTERCHANGE, PLACE JPCP, HMA, AND INSTALL LIGHTING. |
Location Description | SAN DIEGO COUNTY NEAR SAN DIEGO FROM 0.2 MILE WEST OF SANYO AVENUE UNDERCROSSING TO 1.2 MILE EAST OF ENRICO FERMI DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 11/25/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 80 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-11-09-63 | 11/09/2021 | 11/10/2021 | Quality Control | Concrete | View |
2021-11-09-64 | 11/09/2021 | 11/10/2021 | Quality Control | Concrete | View |
2021-11-09-65 | 11/09/2021 | 11/10/2021 | Quality Control | Concrete | View |
2021-11-09-66 | 11/09/2021 | 11/10/2021 | Quality Control | Concrete | View |
2021-11-09-67 | 11/09/2021 | 11/10/2021 | Quality Control | Concrete | View |
2021-11-09-39 | 11/09/2021 | 12/07/2021 | Quality Control | Concrete | View |
2022-01-07-46 | 01/07/2022 | 01/08/2022 | Quality Control | Concrete | View |
2022-01-07-47 | 01/07/2022 | 01/08/2022 | Quality Control | Concrete | View |
2022-01-07-48 | 01/07/2022 | 01/08/2022 | Quality Control | Concrete | View |
2022-01-07-49 | 01/07/2022 | 01/08/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods