Project Details
This page displays current information for project DEA: 07210624.
Project Information
Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
---|---|
DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
Award Date | 02/05/2021 |
Closeout Date | Not set |
Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
QA Service Level | 1 (Verified on 03/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mike.wang@dot.ca.gov | Michael Wang | Resident Engineer | Caltrans RE DB |
keivan.hassan@dot.ca.gov | Keivan Hassan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 961-970 of 1297 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-01-31-17 | 01/31/2025 | 01/31/2025 | Quality Assurance | Concrete | View |
2025-01-24-29 | 01/24/2025 | 01/24/2025 | Quality Assurance | Concrete | View |
2025-01-28-26 | 01/28/2025 | 01/28/2025 | Quality Assurance | Concrete | View |
2025-01-28-27 | 01/28/2025 | 01/28/2025 | Quality Assurance | Concrete | View |
2025-01-31-25 | 01/31/2025 | 02/07/2025 | Quality Assurance | Concrete | View |
2025-02-03-12 | 02/03/2025 | 02/03/2025 | Quality Assurance | Concrete | View |
2025-02-03-13 | 02/03/2025 | 02/03/2025 | Quality Assurance | Concrete | View |
2024-09-12-86 | 09/12/2024 | 09/16/2024 | Verification | Crumb Rubber Modifier | View |
2022-10-10-64 | 10/10/2022 | 10/18/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-10-11-47 | 10/11/2022 | 10/18/2022 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods