Project Details
This page displays current information for project DEA: 080F5434.
Project Information
Project Identifiers | Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 |
---|---|
DIST-CO-RTE-PM | 08-RIV-I-15,SR-91-6.1-7.6 |
Award Date | 03/11/2020 |
Closeout Date | 06/05/2024 |
Work Description | I-15 ELC: 15/91 Express Lanes Connector Project (ELC) |
Location Description | Junction of I-15 and SR-91 in Corona, CA |
QA Service Level | 1 (Verified on 09/16/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Roy.Fisher@parsons.com | Roy Fisher | Resident Engineer | Caltrans RE DB |
aalina@falcon-ca.com | Alhakem Alina | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 219 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-03-14-2 | 03/14/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2022-07-15-1 | 07/15/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
2022-07-15-2 | 07/15/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
2022-08-19-2 | 08/19/2022 | Quality Control | SMTL TM5 - Headed Bars | View | |
2023-01-10-1 | 01/10/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
2023-01-10-4 | 01/10/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
2023-01-10-6 | 01/10/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
2021-03-19-2 | 03/19/2021 | 03/22/2021 | Verification | Aggregate | View |
2021-04-08-8 | 04/08/2021 | 04/09/2021 | Verification | Aggregate | View |
2021-04-23-18 | 04/23/2021 | 04/24/2021 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods