Project Details
This page displays current information for project DIME:215159.
Project Information
Project Identifiers | Project ID: 215159 Permit Numbers: 1220NMC0420 |
---|---|
DIST-CO-RTE-PM | 12---4.011 |
Award Date | 02/02/2021 |
Closeout Date | Not set |
Work Description | Construct a right turn lane on Westbound Imperial Highway (SR-90) at Berry street Intersection.Work includes excavation, grading, traffic signal modification, drainage inlet relocation, retrofit of planting & irrigation and signing & striping within Caltrans Right-of-Way on Imperial Hwy at |
Location Description | Imperial Hwy, Brea |
QA Service Level | 1 (Verified on 09/04/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kevin.k.tran@dot.ca.gov | Kevin Tran | Resident Engineer | Caltrans RE DB |
elie.najm@dot.ca.gov | Elie Najm | Oversight Resident Engineer | Caltrans REO DB |
eric.tsang@dot.ca.gov | Eric Tsang | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods