Project Details
This page displays current information for project DIME:215058.
Project Information
Project Identifiers | Project ID: 215058 Permit Numbers: 11206US0457 |
---|---|
DIST-CO-RTE-PM | 11-SD-8-2.27 |
Award Date | 05/04/2020 |
Closeout Date | 08/24/2021 |
Work Description | Relocation of existing electric meter pedestal, pullbox and wire, electric meter pedestal to be type III, single meter service pedestal, for roadway widening. |
Location Description | Enter upon State Highway right of way in San Diego County, City of San Diego on Route 8, post mile 2.27. Near CAMINO DE LA REINA and HOTEL CIRCLE NORTH (150' WEST OF CALTRANS PULLBOX ON JOB SITE). |
QA Service Level | 1 (Verified on 07/07/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
pedro.aguilar@dot.ca.gov | Pedro Aguilar | Resident Engineer | Caltrans RE DB |
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods