Project Details
This page displays current information for project DEA: 044J7504.
Project Information
Project Identifiers | Project ID: 215005 DEA: 044J7504 EFIS: 0416000005 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84-R0.73/3.06 |
Award Date | 07/07/2022 |
Closeout Date | Not set |
Work Description | INSTALL OUTER SEPARATION BARRIERS Concrete barrier, shoulder widening, striping, cold plane and overlay. |
Location Description | ALAMEDA COUNTY IN FREMONT FROM 0.7 MILE NORTH OF SAN MATEO COUNTY LINE TO 0.1 MILE SOUTH OF TOLL PLAZA |
QA Service Level | 1 (Verified on 10/19/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rodelio.baluyot@dot.ca.gov | Rodelio Baluyot | Resident Engineer | Caltrans RE DB |
vincent.b.tang@dot.ca.gov | Vincent Tang | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 38 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-13-40 | 04/13/2023 | 04/13/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-04-13-41 | 04/13/2023 | 04/13/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-04-13-42 | 04/13/2023 | 04/13/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-04-13-48 | 04/13/2023 | 04/14/2023 | Quality Assurance | Aggregate | View |
2023-04-13-51 | 04/13/2023 | 04/14/2023 | Quality Assurance | Reclaimed Asphalt Pavement | View |
2023-04-13-52 | 04/13/2023 | 04/14/2023 | Quality Assurance | Reclaimed Asphalt Pavement | View |
2023-04-13-53 | 04/13/2023 | 04/14/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-13-83 | 04/13/2023 | 04/14/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-04-14-45 | 04/14/2023 | 04/17/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-14-46 | 04/14/2023 | 04/17/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods