Project Details

This page displays current information for project DEA: 043J7004.

Project Information

Project IdentifiersProject ID: 214973
DEA: 043J7004
EFIS: 0415000183
DIST-CO-RTE-PM04-ALA-80-4.5/R7.6
Award Date11/16/2020
Closeout Date06/22/2023
Work DescriptionCONCRETE BARRIER, LIGHTING, CIDH PILING AND CONCRETE SURFACE TEXTURE.
Location DescriptionALAMEDA COUNTY IN BERKELEY AND ALBANY FROM ROUTE 13/80 SEPARATION NORTH TO 0.4 MILE EAST OF EL CERRITO SEPARATION AND OVERHEAD
QA Service Level1 (Verified on 10/19/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Gregory.Carroll@dot.ca.govGregory CarrollResident EngineerCaltrans RE DB
laraine.woo@dot.ca.govLaraine WooStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-6 of 6 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2021-04-13-1504/13/202104/20/2021Quality AssuranceConcreteView
2021-04-29-304/29/202105/03/2021VerificationSMTL TM3 - Fastener AssemblyView
2021-05-24-2605/24/202106/04/2021Quality AssuranceConcreteView
2021-06-14-3606/14/202106/24/2021Quality AssuranceConcreteView
2021-06-17-3206/17/202106/24/2021Quality AssuranceConcreteView
2021-06-28-3806/28/202107/14/2021Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods