Project Details
This page displays current information for project DEA: 11288834.
Project Information
Project Identifiers | Project ID: 214937 DEA: 11288834 EFIS: 1117000088 |
---|---|
DIST-CO-RTE-PM | 11-SD-11,125,905-various |
Award Date | 07/28/2020 |
Closeout Date | 03/05/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, PAVEMENT, BARRIER, AND INSTALL LIGHTING. HPLUL-6211(133) SR-125 SB to WB SR-905 |
Location Description | SAN DIEGO COUNTY IN AND NEAR SAN DIEGO AT ROUTE 11/125/905 SEPARATION |
QA Service Level | 1 (Verified on 09/04/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
carlos.covarrubias@dot.ca.gov | Carlos Covarrubias | Resident Engineer | Caltrans RE DB |
michael.charak@dot.ca.gov | Michael Charak | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-12 of 12 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-12-10-7 | 12/10/2020 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2020-12-10-6 | 12/10/2020 | 12/14/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods