Project Details
This page displays current information for project DIME:214913.
Project Information
Project Identifiers | Project ID: 214913 Permit Numbers: 1119NMC0351 1120NRW0638 1120NRW0881 11206RW0786 11206RW0897 |
---|---|
DIST-CO-RTE-PM | 11---8.56 |
Award Date | 06/01/2019 |
Closeout Date | 08/24/2021 |
Work Description | to remove 1,280 feet of shoulder pavement, construct an island refuge passageway, traffic striping for two (2) new crosswalks, modify traffic signal, construct three (3) curb ramps, install new curb and gutter and 6 feet wide sidewalk, as shown on the attached plans, in accordance with the requirem |
Location Description | INTERSTATE 5, CHULA VISTA |
QA Service Level | 1 (Verified on 04/17/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
pedro.aguilar@dot.ca.gov | Pedro Aguilar | Resident Engineer | Caltrans RE DB |
kieran.fung@dot.ca.gov | Kieran Fung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods