Project Details

This page displays current information for project DEA: 06442554.

Project Information

Project IdentifiersProject ID: 214892
DEA: 06442554
EFIS: 0612000176
COOP: 061699
DIST-CO-RTE-PM06-KER-46-29.7/31.9
Award Date01/08/2021
Closeout DateNot set
Work DescriptionCONVERT 2-LANE TO 4-LANE HMA PAVEMENT AND CONSTRUCT NEW BRIDGE.
Location DescriptionKERN COUNTY AT AND NEAR LOST HILLS FROM 0.2 MILE WEST OF CALIFORNIA AQUEDUCT BRIDGE TO 1.4 MILES EAST OF LOST HILLS ROAD
QA Service Level1 (Verified on 06/17/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
trever.shiplee@nv5.comTrever ShipleeResident EngineerCaltrans RE DB
gabriel.macias@dot.ca.govGabriel MaciasStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 21-30 of 226 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2023-08-22-1708/22/202308/23/2023AcceptanceAggregateView
2023-08-18-1508/18/202308/18/2023AcceptanceHot Mix AsphaltView
2023-08-18-1708/18/202308/21/2023AcceptanceHot Mix AsphaltView
2023-08-18-1808/18/202308/21/2023AcceptanceHot Mix AsphaltView
2023-08-18-1908/18/202308/18/2023AcceptanceAggregateView
2023-08-18-2108/18/202308/18/2023AcceptanceAggregateView
2023-08-18-2208/18/202308/18/2023AcceptanceAggregateView
2023-08-18-3908/18/202308/21/2023AcceptanceHot Mix AsphaltView
2023-08-18-4008/18/202308/18/2023AcceptanceAggregateView
2023-08-18-5408/18/202308/21/2023AcceptanceHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-2 of 2 results.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
4790291557.101.1Low-Alloy Steel BarsNucor Steel, Incorporated - SeattleNapa Pacific Steel Group (Jessica Berndt)241452 Lbs.
4790291557.101.1Low-Alloy Steel BarsNucor Steel, Incorporated - SeattleNapa Pacific Steel Group (Jessica Berndt)211662 Lbs.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods