Project Details
This page displays current information for project DEA: 081H3414.
Project Information
| Project Identifiers | Project ID: 214848 DEA: 081H3414 EFIS: 0818000172 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-210,215,259-Various |
| Award Date | 05/07/2020 |
| Closeout Date | 10/13/2022 |
| Work Description | PLACE RHMA-G, COLD PLANE AC AND REPLACE AC SURFACING. |
| Location Description | SAN BERNARDINO COUNTY ON ROUTE 210, 215 AND 259 AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 07/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| rambod.sufipur@dot.ca.gov | Rambod Sufipur | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 157 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-10-16-14 | 10/16/2020 | 10/20/2020 | Quality Assurance | Hot Mix Asphalt | View |
| 2020-10-17-12 | 10/17/2020 | 10/21/2020 | Quality Assurance | Hot Mix Asphalt | View |
| 2020-10-19-24 | 10/19/2020 | 10/21/2020 | Quality Assurance | Hot Mix Asphalt | View |
| 2020-10-20-32 | 10/20/2020 | 10/23/2020 | Quality Assurance | Hot Mix Asphalt | View |
| 2020-10-21-31 | 10/21/2020 | 10/23/2020 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-04-05-6 | 04/05/2022 | 04/07/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-04-06-7 | 04/06/2022 | 04/08/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-04-05-14 | 04/05/2022 | 04/05/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-04-06-10 | 04/06/2022 | 04/06/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-04-10-1 | 04/10/2022 | 04/11/2022 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
