Project Details
This page displays current information for project DEA: 031E0504.
Project Information
Project Identifiers | Project ID: 214837 DEA: 031E0504 EFIS: 0300020600 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-31.5/36.9 |
Award Date | 06/04/2020 |
Closeout Date | 09/27/2021 |
Work Description | REPLACE CULVERT AND DRAINAGE SYSTEM. |
Location Description | PLACER COUNTY FROM WEST OF ILLINOIS TOWN OVERCROSSING TO EAST OF CAPE HORN UNDERCROSSING |
QA Service Level | 1 (Verified on 03/24/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
randie.babbini@dot.ca.gov | Randie Babbini | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-14-24 | 04/14/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-15-22 | 04/15/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-16-20 | 04/16/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-26-18 | 04/26/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-27-17 | 04/27/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-28-7 | 04/28/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
2021-04-29-12 | 04/29/2021 | 04/30/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods