Project Details
This page displays current information for project DEA: 081F1324.
Project Information
Project Identifiers | Project ID: 214774 DEA: 081F1324 EFIS: 0815000212 |
---|---|
DIST-CO-RTE-PM | 08-SBD-95-64.5/80.5 |
Award Date | 05/04/2020 |
Closeout Date | 01/18/2022 |
Work Description | PLACE RHMA-G, COLD PLANE AC AND REPLACE AC SURFACING. |
Location Description | SAN BERNARDINO COUNTY ON ROUTE 95 FROM 0.5 MILE NORTH OF GOFFS ROAD TO NEVADA STATE LINE. |
QA Service Level | 1 (Verified on 08/25/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 45 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-10-08-37 | 10/08/2020 | 10/09/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-10-09-14 | 10/09/2020 | 10/12/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-10-12-17 | 10/12/2020 | 10/13/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-10-05-18 | 10/05/2020 | 10/06/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-10-13-13 | 10/13/2020 | 10/14/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-10-14-21 | 10/14/2020 | 10/15/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-07-07-5 | 07/07/2020 | 07/09/2020 | Verification | Aggregate | View |
2020-08-14-3 | 08/14/2020 | 08/17/2020 | Verification | Aggregate | View |
2020-09-03-7 | 09/03/2020 | 09/04/2020 | Verification | Aggregate | View |
2020-09-15-3 | 09/15/2020 | 09/17/2020 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods