Project Details
This page displays current information for project DEA: 07323904.
Project Information
Project Identifiers | Project ID: 214708 DEA: 07323904 EFIS: 0716000072 |
---|---|
DIST-CO-RTE-PM | 07-VEN-1-21.3/28.4 |
Award Date | 03/27/2023 |
Closeout Date | Not set |
Work Description | COLD PLANE AC, PLACE RUBBERIZED HOT MIX AS |
Location Description | VENTURA COUNTY NEAR VENTURA FROM ROUTE 1/101 SEPARATION TO MOBIL PIER ROAD. |
QA Service Level | 1 (Verified on 07/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
alfred.ira@dot.ca.gov | Alfred Ira | Resident Engineer | Caltrans RE DB |
raymond.aludino@dot.ca.gov | Raymond Aludino | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 40 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-12-19-17 | 12/19/2019 | 12/20/2019 | Preliminary | Soil | View |
2019-12-19-18 | 12/19/2019 | 12/20/2019 | Preliminary | Soil | View |
2019-12-19-19 | 12/19/2019 | 12/20/2019 | Preliminary | Soil | View |
2019-12-19-20 | 12/19/2019 | 12/20/2019 | Preliminary | Soil | View |
2019-12-19-15 | 12/19/2019 | 01/07/2020 | Preliminary | Soil | View |
2019-12-19-16 | 12/19/2019 | 01/07/2020 | Preliminary | Soil | View |
2023-11-28-34 | 11/28/2023 | 12/01/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-11-28-36 | 11/28/2023 | 12/01/2023 | Acceptance | Hot Mix Asphalt | View |
2023-11-28-37 | 11/28/2023 | 12/01/2023 | Verification | Asphalt Binder | View |
2023-11-28-42 | 11/28/2023 | 12/01/2023 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods