Project Details
This page displays current information for project DEA: 030F2864.
Project Information
Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
Location Description | Sacramento County |
QA Service Level | 1 (Verified on 04/20/2020) |
Samples
Samples submitted for this project.
Displaying 141-150 of 420 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-07-30-4 | 07/30/2021 | 08/02/2021 | Quality Assurance | Concrete | View |
2021-07-30-5 | 07/30/2021 | 08/02/2021 | Quality Assurance | Concrete | View |
2021-07-29-7 | 07/29/2021 | 08/02/2021 | Quality Assurance | Concrete | View |
2021-07-28-14 | 07/28/2021 | 07/30/2021 | Quality Assurance | Concrete | View |
2021-07-28-15 | 07/28/2021 | 07/30/2021 | Quality Assurance | Concrete | View |
2021-07-27-21 | 07/27/2021 | 07/30/2021 | Quality Assurance | Concrete | View |
2021-07-26-15 | 07/26/2021 | 07/30/2021 | Quality Assurance | Concrete | View |
2021-07-26-20 | 07/26/2021 | 07/30/2021 | Quality Assurance | Concrete | View |
2021-07-24-1 | 07/24/2021 | 07/26/2021 | Quality Assurance | Concrete | View |
2021-07-23-3 | 07/23/2021 | 07/26/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods