Project Details
This page displays current information for project DEA: 120N8904.
Project Information
| Project Identifiers | Project ID: 214698 DEA: 120N8904 EFIS: 1214000130 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-133-8.3/M9.3 |
| Award Date | 11/09/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT AUXILIARY LANE. |
| Location Description | ORANGE COUNTY IN IRVINE FROM ROUTE 133/405 SEPARATION TO IRVINE CENTER DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 02/22/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| aghiam@fountainheadcorp.com | Arezo Ghiam | Resident Engineer | Caltrans RE DB |
| michael.yee@dot.ca.gov | Michael Yee | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 225 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-03-05-68 | 03/05/2024 | 03/05/2024 | Quality Control | Concrete | View |
| 2024-03-05-69 | 03/05/2024 | 03/05/2024 | Quality Control | Aggregate | View |
| 2024-03-06-45 | 03/06/2024 | 03/07/2024 | Quality Control | Concrete | View |
| 2024-03-06-46 | 03/06/2024 | 03/07/2024 | Quality Control | Aggregate | View |
| 2024-03-07-47 | 03/07/2024 | 03/07/2024 | Quality Control | Aggregate | View |
| 2024-03-07-48 | 03/07/2024 | 03/07/2024 | Quality Control | Concrete | View |
| 2024-03-19-68 | 03/19/2024 | 03/19/2024 | Quality Control | Aggregate | View |
| 2024-03-19-69 | 03/19/2024 | 03/20/2024 | Quality Control | Concrete | View |
| 2024-03-19-70 | 03/19/2024 | 03/20/2024 | Quality Control | Concrete | View |
| 2024-03-26-83 | 03/26/2024 | 03/27/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
