Project Details
This page displays current information for project DEA: 07307104.
Project Information
| Project Identifiers | Project ID: 214697 DEA: 07307104 EFIS: 0714000213 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-32.8 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | CONSTRUCT BRIDGE. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR AGOURA HILLS FROM 0.1 MILE WEST OF LIBERTY CANYON ROAD UNDERCROSSING TO 0.6 MILE EAST OF PALO COMADO OVERCROSSING |
| QA Service Level | 1 (Verified on 07/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Sam.Toutounchian@dot.ca.gov | Sam Toutounchian | Resident Engineer | Caltrans RE DB |
| darwin.vargas@dot.ca.gov | Darwin Vargas | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 121-130 of 171 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-29-6 | 06/29/2024 | 07/01/2024 | Acceptance | Concrete | View |
| 2024-06-29-7 | 06/29/2024 | 07/01/2024 | Acceptance | Concrete | View |
| 2024-06-29-8 | 06/29/2024 | 07/01/2024 | Acceptance | Concrete | View |
| 2024-07-20-2 | 07/20/2024 | 07/22/2024 | Acceptance | Concrete | View |
| 2024-07-23-13 | 07/23/2024 | 07/20/2024 | Acceptance | Concrete | View |
| 2024-08-28-39 | 08/28/2024 | 08/30/2024 | Verification | Aggregate | View |
| 2024-08-28-40 | 08/28/2024 | 08/30/2024 | Verification | Crumb Rubber Modifier | View |
| 2024-08-28-41 | 08/28/2024 | 08/30/2024 | Verification | Crumb Rubber Modifier | View |
| 2024-08-28-44 | 08/28/2024 | 08/30/2024 | Verification | Hot Mix Asphalt | View |
| 2024-08-28-52 | 08/28/2024 | 08/30/2024 | Verification | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
