Project Details
This page displays current information for project DEA: 021H5104.
Project Information
Project Identifiers | Project ID: 214681 DEA: 021H5104 EFIS: 0216000148 |
---|---|
DIST-CO-RTE-PM | 02-TEH-99-9.0/9.3 |
Award Date | 11/04/2021 |
Closeout Date | 08/14/2023 |
Work Description | CHAMPLIN SLOUGH |
Location Description | REPLACE BRIDGE IN TEHAMA COUNTY NEAR LOS MOLINOS FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF CHAMPLIN SLOUGH |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
george.moore@dot.ca.gov | George Moore | Resident Engineer | Caltrans RE DB |
george.moore@dot.ca.gov | George Moore | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 23 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-02-03-10 | 02/03/2020 | 02/04/2020 | Preliminary | Soil | View |
2022-05-11-7 | 05/11/2022 | 05/11/2022 | Quality Assurance | Concrete | View |
2022-05-12-11 | 05/12/2022 | 05/12/2022 | Quality Assurance | Concrete | View |
2022-07-06-16 | 07/06/2022 | 07/07/2022 | Quality Assurance | Concrete | View |
2022-04-11-9 | 04/11/2022 | 04/12/2022 | Quality Control | Concrete | View |
2022-04-11-10 | 04/11/2022 | 04/11/2022 | Quality Control | Aggregate | View |
2022-04-12-12 | 04/12/2022 | 04/13/2022 | Quality Control | Concrete | View |
2022-04-13-29 | 04/13/2022 | 04/14/2022 | Quality Control | Concrete | View |
2022-04-15-26 | 04/15/2022 | 04/15/2022 | Quality Control | Concrete | View |
2022-04-15-29 | 04/15/2022 | 04/18/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods