Project Details
This page displays current information for project DEA: 120N7204.
Project Information
Project Identifiers | Project ID: 214674 DEA: 120N7204 EFIS: 1214000093 |
---|---|
DIST-CO-RTE-PM | 12-ORA-73-10.0/R28.0 |
Award Date | 09/16/2020 |
Closeout Date | Not set |
Work Description | IN ORANGE COUNTY IN LAGUNA NIGUEL, LAGUNA BEACH, NEWPORT BEACH, ALISO VIEJO, LAGUNA HILLS, IRVINE AND COSTA MESA FROM 0.3 MI SOUTH OF NB 73/SB 5 CONNECTOR TO 0.2 MILE NORTH OF NB 73/NB 405 CONNECTOR. |
Location Description | UPGRADE SAFETY DEVICES, RELOCATE CONTROL CABINET, CCTV'S & ELECTROLIERS, REMOVE & REPLACE OH SIGN STRUCTURES |
QA Service Level | 1 (Verified on 10/27/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
monas.chaun@dot.ca.gov | MONAS CHAUDRY, MONAS | Resident Engineer | Caltrans RE DB |
chungkeun.lee@dot.ca.gov | Chungkeun Lee | Structural Representative | Caltrans SR DB |
danny.chung@dot.ca.gov | Danny Chung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-10-22-21 | 10/22/2019 | 10/22/2019 | Preliminary | Soil | View |
2019-10-22-22 | 10/22/2019 | 10/22/2019 | Preliminary | Soil | View |
2019-10-22-23 | 10/22/2019 | 10/22/2019 | Preliminary | Soil | View |
2019-10-22-24 | 10/22/2019 | 10/22/2019 | Preliminary | Soil | View |
2019-10-22-25 | 10/22/2019 | 10/22/2019 | Preliminary | Soil | View |
2021-03-19-20 | 03/19/2021 | 03/29/2021 | Verification | Aggregate | View |
2023-05-24-69 | 05/24/2023 | 05/24/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods