Project Details
This page displays current information for project DEA: 07303904.
Project Information
Project Identifiers | Project ID: 214671 DEA: 07303904 EFIS: 0714000044 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-31.2/37.2 |
Award Date | 11/25/2020 |
Closeout Date | 10/11/2023 |
Work Description | LANE REPLACEMENT |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/21/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hai.hong@dot.ca.gov | Hai Hong | Resident Engineer | Caltrans RE DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 271-280 of 285 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-01-09-4 | 01/09/2022 | 01/14/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-01-09-3 | 01/09/2022 | 01/11/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-01-09-2 | 01/09/2022 | 01/11/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-01-08-3 | 01/08/2022 | 01/08/2022 | Per Request | Soil | View |
2022-01-08-2 | 01/08/2022 | 01/08/2022 | Per Request | Soil | View |
2022-01-08-1 | 01/08/2022 | 01/08/2022 | Per Request | Concrete | View |
2022-01-07-3 | 01/07/2022 | 01/07/2022 | Per Request | Concrete | View |
2021-09-28-46 | 09/28/2021 | 10/29/2021 | Department Acceptance | Concrete | View |
2021-09-28-43 | 09/28/2021 | 09/29/2021 | Quality Assurance | Concrete | View |
2021-04-02-18 | 04/02/2021 | 04/16/2021 | Quality Assurance | Rapid Set | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods