Project Details
This page displays current information for project DEA: 07303904.
Project Information
Project Identifiers | Project ID: 214671 DEA: 07303904 EFIS: 0714000044 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-31.2/37.2 |
Award Date | 11/25/2020 |
Closeout Date | 10/11/2023 |
Work Description | LANE REPLACEMENT |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/21/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hai.hong@dot.ca.gov | Hai Hong | Resident Engineer | Caltrans RE DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 201-210 of 285 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-03-12-9 | 03/12/2022 | 03/12/2022 | Quality Assurance | Soil | View |
2022-03-12-8 | 03/12/2022 | 03/12/2022 | Quality Assurance | Soil | View |
2022-03-12-7 | 03/12/2022 | 03/12/2022 | Quality Assurance | Soil | View |
2022-03-12-1 | 03/12/2022 | 03/13/2022 | Department Acceptance | Concrete | View |
2022-02-13-3 | 02/13/2022 | 02/13/2022 | Department Acceptance | Concrete | View |
2022-02-13-2 | 02/13/2022 | 02/13/2022 | Quality Assurance | Concrete | View |
2022-02-13-1 | 02/13/2022 | 02/13/2022 | Quality Assurance | Concrete | View |
2022-02-12-24 | 02/12/2022 | 02/14/2022 | Verification | Aggregate | View |
2022-02-12-22 | 02/12/2022 | 03/12/2022 | Department Acceptance | Aggregate | View |
2022-02-12-21 | 02/12/2022 | 02/15/2022 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods