Project Details
This page displays current information for project DEA: 081G5504.
Project Information
Project Identifiers | Project ID: 214665 DEA: 081G5504 EFIS: 0816000035 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-R28.9 |
Award Date | 03/09/2021 |
Closeout Date | 01/18/2022 |
Work Description | REPLACE WEIGH-IN-MOTION SYSTEM WITH HIGH SPEED WEIGH-IN-MOTION SYSTEM. |
Location Description | SAN BERNARDINO COUNTY NEAR NEWBERRY SPRINGS AT 3.6 MILES WEST OF HECTOR ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thanh.pham@dot.ca.gov | Thanh Pham | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 13 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-09-22-34 | 09/22/2021 | 09/27/2021 | Verification | Aggregate | View |
2021-09-22-40 | 09/22/2021 | 09/27/2021 | Per Request | Asphalt Binder | View |
2021-09-23-26 | 09/23/2021 | 09/24/2021 | Department Acceptance | Hot Mix Asphalt | View |
2021-09-23-35 | 09/23/2021 | 09/24/2021 | Department Acceptance | Asphalt Rubber Binder | View |
2021-09-21-18 | 09/21/2021 | 09/23/2021 | Verification | Aggregate | View |
2021-09-21-19 | 09/21/2021 | 09/23/2021 | Verification | Crumb Rubber Modifier | View |
2021-09-21-20 | 09/21/2021 | 09/23/2021 | Verification | Crumb Rubber Modifier | View |
2021-09-23-41 | 09/23/2021 | 09/23/2021 | Per Request | Asphalt Rubber Binder | View |
2021-08-07-6 | 08/07/2021 | 09/03/2021 | Quality Assurance | Concrete | View |
2021-08-07-4 | 08/07/2021 | 08/13/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods