Project Details
This page displays current information for project DEA: 081F7304.
Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 181-190 of 198 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-12-04-61 | 12/04/2023 | 12/08/2023 | Quality Control | Concrete | View |
2021-11-23-17 | 11/23/2021 | 11/29/2021 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2022-03-11-2 | 03/11/2022 | 03/14/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-03-16-1 | 03/16/2022 | 03/21/2022 | Quality Assurance | SMTL TM5 - Couplers | View |
2022-03-16-2 | 03/16/2022 | 03/21/2022 | Quality Assurance | SMTL TM5 - Couplers | View |
2022-06-07-27 | 06/07/2022 | 06/09/2022 | Quality Assurance | Concrete | View |
2023-01-13-40 | 01/13/2023 | 02/08/2023 | Quality Assurance | Concrete | View |
2023-03-11-1 | 03/11/2023 | 03/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-08-28-31 | 08/28/2023 | 08/31/2023 | Quality Assurance | Concrete | View |
2023-10-12-51 | 10/12/2023 | 10/20/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods