Project Details
This page displays current information for project DEA: 081F7304.
Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 111-120 of 198 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-06-15-68 | 06/15/2023 | 06/16/2023 | Quality Control | Concrete | View |
2023-06-15-69 | 06/15/2023 | 06/16/2023 | Quality Control | Concrete | View |
2023-07-06-69 | 07/06/2023 | 07/07/2023 | Quality Control | Concrete | View |
2023-07-18-74 | 07/18/2023 | 07/19/2023 | Quality Control | Concrete | View |
2023-07-20-65 | 07/20/2023 | 07/21/2023 | Quality Control | Concrete | View |
2023-08-28-31 | 08/28/2023 | 08/31/2023 | Quality Assurance | Concrete | View |
2023-07-21-60 | 07/21/2023 | 07/21/2023 | Quality Control | Concrete | View |
2023-08-23-90 | 08/23/2023 | 08/24/2023 | Quality Control | Concrete | View |
2023-08-28-67 | 08/28/2023 | 08/29/2023 | Quality Control | Concrete | View |
2023-08-28-68 | 08/28/2023 | 08/29/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods