Project Details

This page displays current information for project DEA: 043G4744.

Project Information

Project IdentifiersProject ID: 214590
DEA: 043G4744
EFIS: 0412000074
DIST-CO-RTE-PM04-MRN,MRN-580-6.9/7.8,0.0/2.5
Award Date01/14/2021
Closeout DateNot set
Work DescriptionCLEAN AND PAINT STRUCTURAL STEEL BRIDGE.
Location DescriptionCONTRA COSTA AND MARIN COUNTIES IN RICHMOND AND SAN RAFAEL FROM 0.8 MILE WEST OF TOLL PLAZA TO 0.1 MILE EAST OF MAIN STREET
QA Service Level1 (Verified on 02/18/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
behzad.halali@dot.ca.govBehzad HalaliResident EngineerCaltrans RE DB
william.sommer@dot.ca.govWilliam SommerStructural RepresentativeCaltrans SR DB
waqas.ather@dot.ca.govWaqas AtherMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 21-30 of 44 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2023-03-08-5603/08/202303/08/2023Quality AssuranceAggregateView
2023-04-10-5204/10/202304/10/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-10-5304/10/202304/10/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-10-5404/10/202304/10/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-10-5504/10/202304/10/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-10-5604/10/202304/10/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-10-5704/10/202304/10/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-10-5804/10/202304/10/2023Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-04-06-1304/06/202304/11/2023Quality AssuranceRapid SetView
2023-04-05-2904/05/202304/12/2023Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods