Project Details
This page displays current information for project DEA: 043G4744.
Project Information
Project Identifiers | Project ID: 214590 DEA: 043G4744 EFIS: 0412000074 |
---|---|
DIST-CO-RTE-PM | 04-MRN,MRN-580-6.9/7.8,0.0/2.5 |
Award Date | 01/14/2021 |
Closeout Date | Not set |
Work Description | CLEAN AND PAINT STRUCTURAL STEEL BRIDGE. |
Location Description | CONTRA COSTA AND MARIN COUNTIES IN RICHMOND AND SAN RAFAEL FROM 0.8 MILE WEST OF TOLL PLAZA TO 0.1 MILE EAST OF MAIN STREET |
QA Service Level | 1 (Verified on 02/18/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
behzad.halali@dot.ca.gov | Behzad Halali | Resident Engineer | Caltrans RE DB |
william.sommer@dot.ca.gov | William Sommer | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 44 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-03-14-34 | 03/14/2024 | 03/20/2024 | Quality Assurance | Concrete | View |
2024-03-13-9 | 03/13/2024 | 03/20/2024 | Quality Assurance | Concrete | View |
2024-02-07-8 | 02/07/2024 | 02/08/2024 | Quality Assurance | Concrete | View |
2024-01-17-46 | 01/17/2024 | 01/18/2024 | Quality Assurance | Aggregate | View |
2024-01-17-13 | 01/17/2024 | 01/18/2024 | Quality Assurance | Aggregate | View |
2024-01-04-2 | 01/04/2024 | 01/05/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-12-28-3 | 12/28/2023 | 12/29/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-12-21-9 | 12/21/2023 | 12/21/2023 | Acceptance | Aggregate | View |
2023-12-14-35 | 12/14/2023 | 12/20/2023 | Quality Assurance | Aggregate | View |
2023-12-13-35 | 12/13/2023 | 12/20/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods