Project Details
This page displays current information for project DEA: 043G4744.
Project Information
Project Identifiers | Project ID: 214590 DEA: 043G4744 EFIS: 0412000074 |
---|---|
DIST-CO-RTE-PM | 04-MRN,MRN-580-6.9/7.8,0.0/2.5 |
Award Date | 01/14/2021 |
Closeout Date | Not set |
Work Description | CLEAN AND PAINT STRUCTURAL STEEL BRIDGE. |
Location Description | CONTRA COSTA AND MARIN COUNTIES IN RICHMOND AND SAN RAFAEL FROM 0.8 MILE WEST OF TOLL PLAZA TO 0.1 MILE EAST OF MAIN STREET |
QA Service Level | 1 (Verified on 02/18/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
behzad.halali@dot.ca.gov | Behzad Halali | Resident Engineer | Caltrans RE DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 32 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-23-17 | 09/23/2023 | 09/23/2023 | Per Request | SMTL TM3 - Fastener Assembly | View |
2023-05-03-5 | 05/03/2023 | 05/05/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-04-10-52 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-10-53 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-10-54 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-10-55 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-10-56 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-10-57 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-10-58 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-06-13 | 04/06/2023 | 04/11/2023 | Quality Assurance | Rapid Set | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods