Project Details
This page displays current information for project DIME:214574.
Project Information
Project Identifiers | Project ID: 214574 Permit Numbers: 0419NSN1668 0420NRT0247 04206DP0165 0419NSN1668 |
---|---|
DIST-CO-RTE-PM | 04-CC-680-2.89 |
Award Date | 08/01/2019 |
Closeout Date | 04/27/2023 |
Work Description | Restriping and signal modification.perform traffic control, remove existing stripe marking; install new striping by converting number 3 lane from shared through/right lane to a through lane only; install surface-mounted channelizers between lane 2 and 3 on westbound Bollinger Canyon Road; and insta |
Location Description | i-680 at Bollinger Canyon Road Interchange, San Ramon |
QA Service Level | 1 (Verified on 12/10/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jay.linnemann@dot.ca.gov | Jay Linnemann | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods