Project Details
This page displays current information for project DEA: 10403503.
Project Information
Project Identifiers | Project ID: 214482 DEA: 10403503 EFIS: 1000000424 COOP: 104075 |
---|---|
DIST-CO-RTE-PM | 10-STA-132-R11.3/R14.7 |
Award Date | 09/24/2019 |
Closeout Date | 03/04/2022 |
Work Description | SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti. |
Location Description | freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing |
QA Service Level | 2 (Verified on 10/14/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ranbir.bhullar@dot.ca.gov | Ranbir Bhullar | Resident Engineer | Caltrans RE DB |
Rick.Deml@wsp.com | Rick Deml | Oversight Resident Engineer | Caltrans REO DB |
george.samuel@dot.ca.gov | George Samuel | Structural Representative | Caltrans SR DB |
inderjit.chadha@wsp.com | Indy Chada | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods