Project Details
This page displays current information for project DEA: 043G6204.
Project Information
Project Identifiers | Project ID: 214463 DEA: 043G6204 EFIS: 0412000141 |
---|---|
DIST-CO-RTE-PM | 04-SF-101-2.0 |
Award Date | 02/20/2020 |
Closeout Date | 01/13/2023 |
Work Description | Replace bridge concrete decks, concrete barriers and bridge railings |
Location Description | Construction on State Highway in the city and county of San Francisco at Alemany Circle Undercrossing |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jose.david@dot.ca.gov | Jose David | Resident Engineer | Caltrans RE DB |
sergio.gomez@dot.ca.gov | Sergio Gomez | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-04-29-1 | 04/29/2020 | 04/29/2020 | Verification | Concrete | View |
2020-04-29-2 | 04/29/2020 | 04/29/2020 | Verification | Concrete | View |
2020-04-29-3 | 04/29/2020 | 04/29/2020 | Verification | Concrete | View |
2020-04-29-4 | 04/29/2020 | 04/29/2020 | Verification | Concrete | View |
2020-04-26-1 | 04/26/2020 | 04/26/2020 | Verification | Concrete | View |
2020-04-26-2 | 04/26/2020 | 04/26/2020 | Verification | Concrete | View |
2020-04-26-3 | 04/26/2020 | 04/26/2020 | Verification | Concrete | View |
2020-04-26-4 | 04/26/2020 | 04/26/2020 | Verification | Concrete | View |
2020-04-21-1 | 04/21/2020 | 04/21/2020 | Quality Assurance | Concrete | View |
2020-04-09-10 | 04/09/2020 | 04/09/2020 | Quality Assurance | SMTL TM6 - Steel Check Sample Plate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods