Project Details
This page displays current information for project DEA: 040J6424.
Project Information
| Project Identifiers | Project ID: 214422 DEA: 040J6424 EFIS: 0414000476 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-32.8/R54.2 |
| Award Date | 12/24/2019 |
| Closeout Date | 01/03/2025 |
| Work Description | CRACK, SEAT AND OVERLAY WITH RHMA AND HMA, AND REPLACE CULVERTS. |
| Location Description | SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION |
| QA Service Level | 1 (Verified on 09/23/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 136 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-07-16-11 | 07/16/2021 | 07/16/2021 | Quality Control | Concrete | View |
| 2021-07-19-2 | 07/19/2021 | 07/19/2021 | Quality Control | Concrete | View |
| 2021-07-21-27 | 07/21/2021 | 07/21/2021 | Quality Control | Concrete | View |
| 2021-07-22-27 | 07/22/2021 | 07/22/2021 | Quality Control | Concrete | View |
| 2021-07-23-9 | 07/23/2021 | 07/23/2021 | Quality Control | Concrete | View |
| 2021-07-26-4 | 07/26/2021 | 07/26/2021 | Quality Control | Concrete | View |
| 2021-08-04-8 | 08/04/2021 | 08/04/2021 | Quality Control | Concrete | View |
| 2021-08-06-7 | 08/06/2021 | 08/06/2021 | Quality Control | Concrete | View |
| 2021-08-09-7 | 08/09/2021 | 08/09/2021 | Quality Control | Concrete | View |
| 2021-08-10-6 | 08/10/2021 | 08/10/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
