Project Details
This page displays current information for project DIME:214172.
Project Information
Project Identifiers | Project ID: 214172 Permit Numbers: 0417NMC1910 04196DP0966 |
---|---|
DIST-CO-RTE-PM | 04-SM-82-9.35/10.07 |
Award Date | 05/25/2018 |
Closeout Date | 03/16/2021 |
Work Description | The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... |
Location Description | S. El Camino Real, San Mateo |
QA Service Level | 1 (Verified on 05/22/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
charles.koos@dot.ca.gov | Charles Koos | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods