Project Details
This page displays current information for project DIME:214134.
Project Information
Project Identifiers | Project ID: 214134 Permit Numbers: 0519NCS0156 05196DP0549 0519NRT0813 0519NRT0814 0519NRT0812 |
---|---|
DIST-CO-RTE-PM | 05---25.267 |
Award Date | 06/24/2019 |
Closeout Date | 10/29/2020 |
Work Description | Sycamore Drive Pedestrian Improvements Project, which includes ADA curb ramps and sidewalk, new curb and gutter, slurry seal and a new crosswalk. |
Location Description | Highway 246, Buellton |
QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
adolfo.gonzalez@dot.ca.gov | Adolfo Gonzalez | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods