Project Details
This page displays current information for project DEA: 09373704.
Project Information
Project Identifiers | Project ID: 214006 DEA: 09373704 EFIS: 0918000004 |
---|---|
DIST-CO-RTE-PM | 09-KER-178,395-75.0/81.0,R23.4/29.5 |
Award Date | 04/19/2019 |
Closeout Date | 01/06/2020 |
Work Description | PLACE HMA (TYPE A) AND RHMA-G. |
Location Description | KERN COUNTY ABOUT 11 MILES WEST OF INYOKERN ON ROUTE 178 FROM 2.0 MILES WEST TO 4.0 MILES EAST OF CANE BRAKE CREEK BRIDGE AND NEAR INYOKERN ON ROUTE 395 FROM 5.8 MILES NORTH TO 0.3 MILE SOUTH OF ROUTE 178/395 SEPARATION |
QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Andy.Tran@dot.ca.gov | Andy Tran | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 17 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-07-22-16 | 07/22/2019 | 07/24/2019 | Verification | Aggregate | View |
2019-07-24-15 | 07/24/2019 | 07/25/2019 | Acceptance | Hot Mix Asphalt | View |
2019-07-25-10 | 07/25/2019 | 07/30/2019 | Acceptance | Hot Mix Asphalt | View |
2019-07-26-8 | 07/26/2019 | 07/30/2019 | Verification | Aggregate | View |
2019-07-29-24 | 07/29/2019 | 07/31/2019 | Acceptance | Hot Mix Asphalt | View |
2019-07-30-13 | 07/30/2019 | 07/31/2019 | Acceptance | Hot Mix Asphalt | View |
2019-07-31-15 | 07/31/2019 | 08/01/2019 | Acceptance | Hot Mix Asphalt | View |
2019-08-01-15 | 08/01/2019 | 08/02/2019 | Acceptance | Hot Mix Asphalt | View |
2019-08-02-14 | 08/02/2019 | 08/08/2019 | Acceptance | Hot Mix Asphalt | View |
2019-08-05-13 | 08/05/2019 | 08/06/2019 | Per Request | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods