Project Details
This page displays current information for project DEA: 010F9604.
Project Information
Project Identifiers | Project ID: 213958 DEA: 010F9604 EFIS: 0116000109 |
---|---|
DIST-CO-RTE-PM | 01-HUM-101-124.5 |
Award Date | 11/06/2019 |
Closeout Date | 11/23/2021 |
Work Description | LITTLE LOST MAN FISH PASSAGE |
Location Description | HUMBOLDT COUNTY NEAR ORICK 0.2 MILE SOUTH OF LOST MAN CREEK BRIDGE |
QA Service Level | 1 (Verified on 06/24/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
karen.sanders@dot.ca.gov | Karen Sanders | Resident Engineer | Caltrans RE DB |
Brian.Cinkutis@dot.ca.gov | Brian Cinkutis | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-04-17-2 | 04/17/2020 | 04/21/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-04-17-3 | 04/17/2020 | 04/21/2020 | Quality Control | SMTL TM5 - Welded Hoops | View |
2020-05-08-12 | 05/08/2020 | 05/13/2020 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2020-05-14-56 | 05/14/2020 | 05/14/2020 | Quality Control | Concrete | View |
2020-05-20-43 | 05/20/2020 | 05/21/2020 | Quality Control | Concrete | View |
2020-05-27-30 | 05/27/2020 | 05/28/2020 | Quality Control | Concrete | View |
2020-06-03-27 | 06/03/2020 | 06/04/2020 | Quality Control | Concrete | View |
2020-06-09-10 | 06/09/2020 | 06/10/2020 | Quality Assurance | Concrete | View |
2020-06-09-31 | 06/09/2020 | 06/10/2020 | Quality Control | Concrete | View |
2020-06-12-25 | 06/12/2020 | 06/13/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods