Project Details

This page displays current information for project DEA: 100P2004.

Project Information

Project IdentifiersProject ID: 213919
DEA: 100P2004
EFIS: 1000000182
COOP: 100487
Permit Numbers: 1019NMC0209
DIST-CO-RTE-PM10-SJ-120-R3.4 to PM R5.2
Award Date03/05/2019
Closeout Date08/04/2021
Work DescriptionSR 120 / Union Road Interchange. Construction of 4 new bridges and widening 47 feet of the overcrossing, reconstruction of all the ramps, auxiliary lanes on both sides of SR 120, Overhead sign and new traffic signals and lighting.
Location DescriptionSR 120 from Airport Way to Union Road and from Union Road to Main Street
QA Service Level2 (Verified on 07/31/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
obaidullah.rashid@dot.ca.govAbdul RashidResident EngineerCaltrans RE DB
stephen.a.pozzo@dot.ca.govStephen PozzoStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods