Project Details
This page displays current information for project DEA: 034H2804.
Project Information
Project Identifiers | Project ID: 213847 DEA: 034H2804 EFIS: 0318000239 MINOR: 03A2859 |
---|---|
DIST-CO-RTE-PM | 03-YOL-80-5.6 |
Award Date | 01/31/2018 |
Closeout Date | 09/15/2022 |
Work Description | INSTALL RAMP METER |
Location Description | YOLO COUNTY NEAR DAVIS AT CHILES ROAD ON-RAMP TO EASTBOUND ROUTE 80. |
QA Service Level | 1 (Verified on 01/08/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods