Project Details
This page displays current information for project DEA: 041J5614.
Project Information
Project Identifiers | Project ID: 213846 DEA: 041J5614 EFIS: 0419000117 |
---|---|
DIST-CO-RTE-PM | 04-SM-101-0.0/6.7 |
Award Date | 12/21/2018 |
Closeout Date | 09/01/2022 |
Work Description | Barrier modifications, overhead signs, freeway lighting and electronic toll system components |
Location Description | SANTA CLARA AND SAN MATEO COUNTIES IN PALO ALTO AND REDWOOD CITY FROM 0.3 MILE NORTH OF SAN ANTONIO ROAD TO WHIPPLE AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 12/27/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
douglas.inori@dot.ca.gov | Doug Inori | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-05-02-3 | 05/02/2019 | 05/02/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-05-02-13 | 05/02/2019 | 05/08/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-05-06-6 | 05/06/2019 | 05/13/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-05-24-11 | 05/24/2019 | 06/19/2019 | Quality Assurance | Concrete | View |
2019-06-11-13 | 06/11/2019 | 06/19/2019 | Quality Assurance | Concrete | View |
2019-08-15-7 | 08/15/2019 | 08/16/2019 | Quality Assurance | SMTL TM5 - Couplers | View |
2019-09-04-9 | 09/04/2019 | 09/11/2019 | Quality Assurance | Concrete | View |
2019-09-05-21 | 09/05/2019 | 09/11/2019 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods