Project Details

This page displays current information for project DIME:213773.

Project Information

Project IdentifiersProject ID: 213773
Permit Numbers: 1015NMC0093 1017NRT0103 1018NDP0719 1018NRT0689
DIST-CO-RTE-PM10---29.8
Award Date06/28/2015
Closeout Date11/09/2021
Work DescriptionInstall adaptive traffic signal system at the Interstate Route 5 interchange with March Lane in Stockton, as shown on the approved plans. The system will include the installation of Model 2070E traffic signal controller with GPS clocks and GPS antenna in existing controller cabinets, and replaceme
Location DescriptionSR 5, Stockton
QA Service Level1 (Verified on 11/15/2018)

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods